Model the existing 220Kv Grid-Connected power station to explore the possibilities of connecting a battery energy storage on site.
Utilities Project
The Issue – Model the existing 220Kv Grid-Connected power station to explore the possibilities of connecting a battery energy storage (BESS) on site.
County Donegal,
Ireland
8 Weekds
220kV
Note: Red trace is ‘base’ dB reading & Purple trace is ‘asset’ dB reading.
An oil sample was taken from the transformer and assessed at site with DGA results showing no abnormal activity within, therefore, suggesting that the potential PD issue as most likely to be on the HV cable terminations of the transformer.